Project description and objectives:
|
The proposed project consists of construction of a new 833 MW lignite fired
unit at an existing 4,300 MWe lignite power plant operated by BOT Elektrownia
Belchatow SA, accompanied by the associated investments i.e. modernisation of
existing power units, additional flue gas desulphurisation (FGD)
installations, new waste disposal system, a cooling tower for the new unit,
etc.
The 833 MW power unit will be constructed on the basis of an EPC “turn-key”
contract with Alstom consortium. The project sponsor is BOT Elektrownia
Belchatow S.A., which belongs to the holding “BOT Górnictwo i Energetyka SA”
(BOT GiE), a State owned power generating company.
The project represents a major step in upgrading existing generating assets in
Poland to ensure that they meet EU environmental legislation post 2008,
notably requirements of the EU Large Combustion Plant and IPPC directives. The
project is also an integral part of Polish governmental energy security
program.
There is a project summary document available for this project.
|
Full EIA availability:
|
Full EIA documentation is available locally at:
ELBIS Sp. z
o.o., Rogowiec, Belchatow.
Tel. +48(44) 735
33 40; Contact: Mr Marek Wdowiak, Technical Director. Website: http://www.elb2.pl/pl/konsultacje.html
And BOT-Elektrownia Belchatow S.A.; Rogowiec,
97-406 Bełchatów 5
Tel: +48 (44) 632-51-32; Contact:
Mr Miroslaw Niewiadomski, Environment Director
And EBRD
Regional Office Warsaw, ul. Emillii Platter 52;
Tel:
48 (22) 520 58 26 Contact Lucyna Stanczak
And
EBRD’s Business Information Centre
in London
|
Enquiries:
|
Environmental enquiries
Mr Miroslaw Niewiadomski, Environment
Director BOT-Elektrownia Belchatow S.A.; Rogowiec, 97-406
Bełchatów 5
Tel: +48 (44) 632-51-32;
General enquiries
Mr Marek Wdowiak, Technical Director ELBIS
Sp. z o.o., Rogowiec, Belchatow.
Tel. +48(44) 735 33 40;
|