Project description and objectives:
|
The proposed project consists of the construction of a new 300 MWe Combined
Cycle Gas Turbine (“CCGT”) power plant located within the existing Alchevsk
Iron & Steel Works facility (“AMK”). This plant will consist of two units,
each comprising of a gas turbine, heat recovery and steam generators, steam
turbine and electricity generators. The new CCGT plant will be located within
the existing steel plant and, after the planned wider modernization of the
steel plant, will utilise process off-gases from the coke ovens, converters,
and blast furnaces. Natural gas will not be required for routine operation of
the CCGT plant. The plant will utilize waste gases, which otherwise would have
to be flared, thereby reducing the environmental impact of the plant. The
construction of the CCGT is to be initiated in 2007 and is expected to be
completed in 2009. The CCGT will be designed to meet all Ukrainian and EU
environmental standards, inclusive of European Union Integrated Pollution,
Prevention and Control (“IPPC”) and Large Combustion Plant Directive (“LCDP”)
requirements. It should be noted that the CCGT development is just one element
of a major wide ranging environmental improvement programme access the
steelworks site as a whole, partially funded by among other the International
Finance Corporation (“IFC”). The intention of these improvements is to provide
significant environmental benefits, particularly with respect to air quality.
There is a project summary document available for this project.
|
EIA summary:
|
Executive summary (English)
(0.5Mb)
Executive summary (Russian)
(0.7Mb)
Public disclosure and consultation plan
(English)
(0.3Mb)
Public disclosure and consultation plan
(Russian)
(0.4Mb)
|
Full EIA availability:
|
Full EIA documentation is available locally at: EBRD’s Business
Information Centre in London
Alchevsk Iron & Steel Works
AMK Environmental Department 4 Schmidt Str, Alchevsk; tel. +38
6442 933 25 Contact: Mr Nickolaj Antonv; e-mail: dikovich@amk.lg.ua
And EBRD
Regional Office Kiev, 27/23 Sofiyska Street 01001 Kiev, Ukraine Fax:
+38 044 2706813 Tel: +380 44 270 6132 Contact: Olga Yeriomina email:
yeriomio@kev.ebrd.com
And http://www.amk.al.lg.ua
And
|
Enquiries:
|
Environmental enquiries:
Mr Nickolaj Antonv
AMK Environmental Department
Alchevsk Iron & Steel Works 4 Schmidt Str, Alchevsk, 94202,
Lugansk region, Ukraine;
Tel. +38 6442 933 25; Fax: 380 (06442) 9-33-76 e-mail: dikovich@amk.lg.ua
General enquiries:
Mr Sergei Yelizarov Consortium "Industrial Group" 14b,
Yaroslaviv Val Street Kyiv, 01034, Ukraine
Tel: + 380 (44) 591 64 13 Fax: + 380 (44) 591 64 55
General e-mail: abrosimov@amk.lg.ua or
Email:
syelizarov@c-ig.com
|
This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.
Environmental Impact Assessments and EIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental Impact Assessment or the EIA Summary do not necessarily reflect the views or opinions of the EBRD. |
| |