Project name:Ekoenergiya Additional Financing
Country:Ukraine
Project number:38780
Business sector:General manufacturing
State/Private:Private
Board date:12 May 2008
Status:Passed concept review, Pending final review
Date EIA disclosed:
Date EIA updated:
13 March 2008
Help

Subscribe to EIA
email alerts

Related links
Ukraine homepage

Project description
and objectives:

In 2006 the Bank approved a loan of USD 150M to Ekoenergiya for the construction of two 151.5 MW Combined Cycle Gas Turbines (CCGT) using waste gases from the Alchevsk Iron and Steel Works and from Alchevsk Coke Works.

The new loan would finance a third 151.5 MW CCGT unit using the remaining waste gases and selling part of the electricity to the national grid. The new CCGT plant will be adjacent to the existing steel plant and, after the planned wider modernization of the steel plant, will utilise process off-gases from the coke ovens, converters, and blast furnaces. Natural gas will not be required for routine operation of the CCGT plant. The plant will utilize waste gases, which otherwise would have to be flared, thereby reducing the environmental impact of the plant. The CCGT will be designed to meet all Ukrainian and EU environmental standards, inclusive of European Union Integrated Pollution, Prevention and Control (“IPPC”) and Large Combustion Plant Directive (“LCDP”) requirements.

EIA summary:

Executive Summary (English)  (1Mb)
Executive Summary (Russian)  (1Mb)

Environmental and Social Impact Assessment Update (English)  (5.7Mb)
Environmental and Social Impact Assessment Update (Russian)  (5.5Mb)

Resettlement Action Plan (English)  (2.6Mb)
Resettlement Action Plan (Russian)  (2.4Mb)

Full EIA availability:

Full EIA documentation is available locally at:
EBRD's Business Information Centre in London

Alchevsk Iron & Steel Works AMK Environmental Department
4 Schmidt Str, Alchevsk;
tel. +38 6442 933 25
Contact: Mr Nickolaj Antonv
E-mail: dikovich@amk.lg.ua

And

EBRD Regional Office Kiev,
27/23 Sofiyska Street
01001 Kiev, Ukraine
Fax: +38 044 2706813
Tel: +380 44 270 6132
Contact: Olga Yeriomina
E-mail: yeriomio@kev.ebrd.com

And

http://www.amk.al.lg.ua

Enquiries:

Mr. Mikhail Yu. Kovalenko
AMK Environmental Department
Alchevsk Iron & Steel Works
4 Schmidt Str,
Alchevsk,
94202, Lugansk region,
Ukraine

Tel. +380 6442 74241;
Fax: +380 6442 93376


This document was prepared at an early stage of project development, before consideration by the EBRD Board of Directors. Details of a project may change following disclosure.

Environmental Impact Assessments and EIA summaries are produced by project sponsors, and the EBRD makes them available without any comment or implied endorsement. Any views expressed or statements made in the Environmental Impact Assessment or the EIA Summary do not necessarily reflect the views or opinions of the EBRD.
Terms and conditions Sitemap Feedback