Project summary document

Project name:Oskol Electrometallurgical Plant
Country:Russia
Project number:2482
Business sector:General manufacturing
Public/Private:Private
Environmental category:B
Board date:4 November 1997
Status:Completed
Date PSD disclosed:
Date PSD updated:
7 October 1997
9 January 1998
Help

Subscribe to PSD
email alerts

Related links
Russia homepage
Russia's top steel producer receives US$ 118 million in EBRD financing [Press Release]

Project description
and objectives:

A loan of US$ 110 million to Oskol Electrometallurgical Plant for the modernisation of an existing rolling mill and construction and installation of a building and related infrastructure for a new mill.

The project consists of: (i) modernisation of existing rolling mill 700; (ii) construction of building and related infrastructure for mill 350; and (iii) installation of rolling mill 350.

Transition impact:

The project will provide support to the Russian manufacturing company in the process of restructuring, strengthen the international and domestic competitiveness of the Russian producer, introduce improvements in corporate governance and encourage the introduction of Western marketing and management skills.

The client:

The borrower is the Oskol Electrometallurgical Plant (OEMK), the most modern steelworks in Russia producing high-quality rolled steel products.

EBRD finance:

A loan of US$ 110 million (ECU 99.5 million) consisting of a term loan of US$ 100 million and a revolving working capital loan of US$ 10 million. The term loan will comprise an "A Loan" portion of US$ 70 million for the account of the EBRD and a "B Loan" portion of US$ 30 million for the account of participating commercial banks.

Total project cost:

The total project costs are estimated at US$ 576 million (ECU 521 million).

Environmental impact:

The project has been classified as B/1, requiring an audit of the existing facilities and an Environmental Analysis of the proposed investment. OEMK is a relatively new plant. It was built between 1975 and 1982 according to the least polluting and most energy-efficient direct iron reduction process and electric arc furnace steel production. As OEMK has no sintering process, coke batteries or blast furnaces, the overall operations are much less polluting than typical for an integrated iron and steel work, and the plant is widely recognised as one of the cleanest and most modern plants in Russia. The environmental consultants found that the environmental awareness and appreciation of environmental, health and safety performance and liabilities of OEMK's management is high and as a result, many of the necessary monitoring and management systems are already in place. The company is making considerable investments in maintenance and renovation of environmental protection facilities and in other activities for continual improvement of its environmental performance. OEMK has developed an Environmental Action Plan to address the issues raised by the environmental audit and analysis. The implementation schedule has been agreed with the Bank and will be monitored closely.

Technical
cooperation:

None

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

Company contact:

 

EBRD contact:

Mary Collins, Operation Leader: collinsm@ebrd.com

Business opportunities:

For business opportunities or procurement, contact the client company.

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.