Project summary document

Project name:Sarajevska Pivara
Country:Bosnia and Herzegovina
Project number:4605
Business sector:Agribusiness
Public/Private:Private
Environmental category:B
Board date:18 November 1997
Status:Completed
Date PSD disclosed:
Date PSD updated:
22 September 1997
25 June 2002
Help

Subscribe to PSD
email alerts

Related links
Bosnia and Herzegovina homepage
Agribusiness homepage

Project description
and objectives:

Modernisation and expansion into soft drinks of one of the largest breweries in Bosnia and Herzegovina.

The project aims to modernise the company, including management and product improvement measures. It also aims to expand the company's operations into carbonated soft drinks and a new range of packaging (cans and plastic bottles).

Transition impact:

The EBRD's direct investment in a local producer will strengthen the local supply in an import-dominated consumer goods market. This will have a significant impact not only on the beverage, distribution and retail sectors but also on the country at large. In particular, the investment will act as a demonstration project for others, including foreign investors, local and foreign banks (viability of medium-term lending) and the government (incentive for speeding up privatisation).

The client:

Sarajevska Pivara d.d. is a medium-sized brewery located in Sarajevo, in the Federation part of Bosnia and Herzegovina. Established in 1864, it has produced beer from its current site since 1880. Last year the company introduced a new packaging line and new products, such as canned beer and soft drinks.

EBRD finance:

The project will be co-financed with the International Finance Corporation (IFC). Both the EBRD and IFC will each provide a seven-year loan of up to DM 8 million (ECU 4.1 million) totalling around DM 16 million (ECU 8.2 million).

Total project cost:

DM 23 million (ECU 11.7 million).

Environmental impact:

This operation has been classified as B/1, requiring an Environmental Analysis and an Environmental Audit. The completion of an Audit has led to the preparation of an Environmental Action Plan (EAP). Issues identified encompassed water supply and quality, waste-water discharge, waste management and potential soil and groundwater contamination. The company will be required to adopt and implement the EAP to the satisfaction of the Bank, and to report annually on the environment and progress on implementing the EAP.

Technical
cooperation:

None

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

Company contact:

 

EBRD contact:

Tim Bezencon, Operation Leader: bezencot@ebrd.com

Business opportunities:

For business opportunities or procurement, contact the client company.

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.