Project summary document

Project name:ISTIL-UKRAINE
Country:Ukraine
Project number:7487
Business sector:General manufacturing
Public/Private:Private
Environmental category:C
Board date:4 September 2001
Status:Completed
Date PSD disclosed:
Date PSD updated:
1 August 2001
15 November 2001
Help

Subscribe to PSD
email alerts

Related links
Ukraine homepage
EBRD's first deal in Ukrainian steel sector [Press Release]

Project description
and objectives:

A proposed US$ 25 million working capital revolving credit facility to support ISTIL (Ukraine), a joint stock company based in Donetsk, south-eastern Ukraine, and its growing business of cast round billets and special quality bars.

The loan proceeds would be used for the purchase of raw materials, energy supplies, transportation costs and other non-capital goods and services needed for manufacturing billets and special quality bars for export and domestic sales, and for restructuring of the existing loans from Ukrainian banks.

Transition impact:

The Bank's financing, a secure source of working capital, would assist ISTIL (Ukraine) in implementing its strategy of producing higher value added products, increasing its export sales and improving profitability. The transition impact would be mainly through providing a clear demonstration effect to other steel producers of the steps that need to be taken to attract such financing. It could also have a demonstration effect for local and foreign banks as a successful working capital facility could encourage them to increase their provision of such financing to strong Ukrainian corporates.

The client:

ISTIL (Ukraine) is the only modern mini steel mill in Ukraine based on electric arc furnace and continuous casting machine technology. The company produces high quality steel products, such as rolled and cast round billets and special quality bars that are sold to rolling mills, seamless pipe manufacturers, engineering plants, distributors and stockists worldwide.

EBRD finance:

US$ 25 million (€28.53 million) working capital revolving credit facility. It will have an A/B structure with two tranches (Tranche 1: US$ 15 million, Tranche 2: US$ 10 million). The Bank proposes to syndicate, on a best efforts basis, up to US$ 10 million of the facility (€11.4 million).

Total project cost:

US$ 124.3 million (€142 million), of which EBRD financing represents 20 per cent.

Environmental impact:

The project was categorised as C/1, requiring an environmental audit, which has been carried out by an independent consultancy firm as part of the market and technical due diligence study. The audit confirmed that the environmental technologies employed at ISTIL (Ukraine) are equivalent to those in Western plants. The new fume collection system meets the highest technology standards.

The audit provided recommendations in the form of an Environmental Action Plan (EAP) to address the identified environmental issues. The EAP includes, besides short-term means, low cost remediation measures: a programme for modernisation to be implemented in future investment projects. Through the implementation of the EAP, ISTIL (Ukraine) will achieve full compliance with Ukrainian environmental, health and safety standards by end of 2002. ISTIL (Ukraine) will be required, through a covenant, to commit itself to the implementation of an EAP.

Technical
cooperation:

None.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

Company contact:

 

EBRD contact:

Maria Ogorodnikova, Operation Leader: ogorodnm@ebrd.com

Business opportunities:

For business opportunities or procurement, contact the client company.

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback