Project summary document

Project name:Bericap Kazakhstan
Country:Kazakhstan
Project number:36369
Business sector:General manufacturing
Public/Private:Private
Environmental category:B
Board date:24 January 2006
Status:Signed
Date PSD disclosed:
Date PSD updated:
6 December 2005
Help

Subscribe to PSD
email alerts

Related links
Kazakhstan homepage
Packaging moves forward in Central Asia [Press Release]

Project description
and objectives:

  • The operation will support investment in a manufacturing facility producing plastic closures (or lids) for the Central Asian food and beverage container market.

  • The Company plans to construct purpose-built produc-tion facilities and relocate its operations in order to

    (a) optimize costs;
    (b) provide space for future expansion; and
    (c) improve the environmental and worker health and safety characteristics of the plant.

Transition impact:

  • Market expansion through forward linkage with the buyers of plastic closures and enhancement of the competitive business environment of smaller produc-ers in the beverages, food, cosmetics and other indus-tries, dependent on closures.

  • Corporate governance impact lies in the adoption of sound environmental, health and safety standards (EAP is a condition of the Bank’s loan).

  • Skills Transfer.

The client:

Bericap Kazakhstan LLC is a plastic closures (container tops) producer, supplying Kazakhstan and other Central Asian markets from a local manufacturing base. It is part of the larger Bericap Holding Group.

EBRD finance:

USD 2.5 million senior loan.

Total project cost:

USD 2.5 million.

Environmental impact:

The construction and operation of the new plastic closures manufacturing plant is likely to be associated with limited environmental, health and safety issues, which can be read-ily identified, assessed and mitigated. The facilities will be located in an industrial area. However, the land allocated for the project has never been used for any industrial activi-ties before. There are no known environmentally or archaeologically valuable or sensitive areas in the vicinity of the site. For the above mentioned reasons, the EBRD has classified the project B/0, requiring an Environmental Analysis.

The Environmental Analysis was carried out by EBRD En-vironment Department. The investigations showed that the Project will be structured to meet Kazakh environmental, health and safety requirements and EU environmental standards, and that the direct environmental, health and safety impacts during the construction and the operation of the new plastic caps plant would be insignificant and effi-ciently mitigated. Environmental protection measures will be fully incorporated in the project design.

Technical
cooperation:

None.

For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

Company contact:

Serdar Hatipoglu, General Director
Bericap Kazakhstan LLP
93d Burundaiskaya street, Turksib rayon
Almaty, Republic of Kazakhstan

Tel: + 7 3272 340603
Fax: + 7 3272 340631

EBRD contact:

Tomas Bravenec, Operation Leader: bravenet@ebrd.com

Business opportunities:

For business opportunities or procurement, contact the client company.

General enquiries:

EBRD project enquiries not related to procurement:
Tel: +44 20 7338 7168; Fax: +44 20 7338 7380
Email: projectenquiries@ebrd.com


Project Summary Documents are created before consideration by the EBRD Board of Directors. Details of a project may change following disclosure of a Project Summary Document. Project Summary Documents cannot be considered to represent official EBRD policy.
Terms and conditions Sitemap Feedback